--- title: "Core Monitoring KPIs" slug: "core-monitoring-kpis-turbine" updated: 2025-10-24T20:58:23Z published: 2025-10-24T20:58:23Z canonical: "docs.bazefield.com/core-monitoring-kpis-turbine" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.bazefield.com/llms.txt > Use this file to discover all available pages before exploring further. # Core Monitoring KPIs ### Overview The *Core Monitoring KPIs* is a Certified Product Point Template for [Wind Turbines](/product/docs/wind-turbine) defines required normalized performance KPIs that provide first-principles performance metrics for all vendors of [Wind Turbines](/product/docs/wind-turbine). The metrics here specifically leverage the raw data in the [*Core Real-Time Data template*](/product/docs/core-real-time-data-2) (e.g. the collection “raw” OPC points expected on all wind turbines) and the normalized calculations in the [*Core Real-Time Calculations template*](/product/docs/core-real-time-calculations-turbine). These calculations specifically translate OEM-specific signals into consistent indicators of operational state, availability, communication status, and event conditions. By abstracting vendor-specific complexities, the Core Real-Time Calculations enable unified fleet monitoring, reduce configuration overhead, and support consistent reporting and alarm management across heterogeneous turbine technologies. This template is foundational for delivering reliable insights in mixed-portfolio environments. ### Template Definition The *Core Monitoring KPIs* is based on a five-minute aggregation layer, formed from inter-related interval expressions (see below). - **Scale Equations:** Algebraic or logical manipulations of input data done on the [Bazefield edge buffer](/product/docs/edge-buffer) - **Online Expressions:** Algebraic or logical manipulations of input data done on the central Bazefield data engines (typically on a [storage node](/product/docs/storage-node)). Similar to scale equations in purpose, but done in the centralized architecture. - **Interval Expressions:** Algebraic, logical, or advanced manipulations of input data done within a pre-define aggregation interval (e.g. 5 minutes, 10 minutes, 1 hour, etc). These are typically done centrally on a [storage node](/product/docs/storage-node). Details on the Point Names, Descriptions, and Types are below. Required for Bazefield Core Dashboard functionality Optional for common additional data streams/sources | Name | Description | Type | Interval | Units | | | --- | --- | --- | --- | --- | --- | | ActivePowerAvg | Average of ActivePower tag over 5 min interval | Calculation (Interval Exp) | 300 s | kW | | | CapacityFactor | Active power in 5min interval divided by rated capacity | Calculation (Interval Exp) | 300 s | % | | | DifferentialPower | Not realized potential power. Potential Power minus Active Power | Calculation (Interval Exp) | 300 s | kW | | | DifferentialPowerExp | Not realized potential power. Expected Power minus Active Power | Calculation (Interval Exp) | 300 s | kW | | | DifferentialPowerTheo | Not realized potential power. Theoretical Power minus Active Power | Calculation (Interval Exp) | 300 s | kW | | | ExpectedPower | Weighted distribution of total park output to available turbine capacity | Calculation (Interval Exp) | 300 s | kW | | | PerformanceIndex | Performance Index using Active power divided by theoretical power in 5 min interval | Calculation (Interval Exp) | 300 s | % | | | PossiblePower | If turbine is available (IEC Ops states 2,3,4,5) estimated power based on power curve using wind speed, if unavailable, then 0 | Calculation (Interval Exp) | 300 s | kW | | | PotentialPower | Used to drive lost energy in allocations. If turbine is unavailable (IEC Ops state 1 or 6) or unknown (IEC Ops State 99) then uses ExpectedPower tag. If turbine is available (IEC Ops State 2,3,4,5) then Theoretical Power Tag | Calculation (Interval Exp) | 300 s | kW | | | TheoreticalPower | Estimated power based on power curve using wind speed | Calculation (Interval Exp) | 300 s | kW | | | TheoreticalPowerOption | Option used for Theoretical Power Calc (1 = Asset; 2 = Neighbor AVG; 3 = PMM; 4 = Asset 1d; 5 = Asset 7d; 6 = AAWS) | Calculation (Interval Exp) | 300 s | -- | | | TotalEnergyExpected.5m | Expected turbine production based on Potential Power tag in 5 min interval | Calculation (Interval Exp) | 300 s | kWh | | | TotalEnergyProduced.5m | Turbine production based on ActivePower tag in 5 min interval | Calculation (Interval Exp) | 300 s | kWh | | | WindSpeedAvg | Average of WindSpeed tag over 5 min interval | Calculation (Interval Exp) | 300 s | m/s | |